CASE STUDY
Pixar Experience London
Up, Up & Away with the Pixar Experience London
Delivering High-Performance Washroom Infrastructure for a Major London Exhibition.
Cr8tive Washrooms were appointed to undertake the full design and build of the washroom facilities for the Pixar Experience in London — a high-profile, high-footfall immersive exhibition environment.
The brief required a facility capable of sustaining significant daily visitor volumes while maintaining premium aesthetic standards aligned with the brand environment.
The result is a durable, contemporary commercial washroom installation engineered for performance, longevity and operational efficiency.
Works included:
Forming internal structure
Structural preparation and service coordination
New mechanical and electrical integration
Bespoke IPS duct panelling system
Solid grade laminate cubicle installation
Solid surface vanity fabrication
Brassware and hygiene systems
Large-format themed graphic integration
Engineered for High Footfall Environments
Visitor attractions require washrooms that perform under continuous use.
Material specification focused on:
High-impact solid grade laminate cubicles
Moisture-resistant IPS systems for long-term durability
Commercial-grade sanitaryware
Seamless solid surface vanity units for ease of maintenance
Slip-resistant commercial safety flooring
Low-maintenance, sensor-operated fittings
Every component was selected to balance durability, compliance, hygiene and lifecycle cost efficiency.
Design Integration Within an Immersive Environment
The washroom aesthetic was carefully considered to complement the exhibition setting while maintaining a clean, refined commercial standard.
Monochrome large-format wall graphics were incorporated within the IPS system to reflect the creative theme of the venue without compromising material performance or maintainability.
The use of timber-finish cubicles and minimalist circular mirrors delivers a contemporary, hospitality-inspired finish suitable for a premium public environment.
Task: Design & Full Turnkey Installation
Client: Pixar
Location: London
Coordinated Delivery in a Live Operational Setting
The project was delivered within a controlled programme to meet exhibition launch requirements.
Cr8tive Washrooms provided:
Full design coordination
M&E integration management
Programme control
Compliance oversight
Quality assurance from concept to completion
Outcome
The completed facility provides:
Long-term operational resilience
Enhanced visitor experience
Efficient cleaning and maintenance access
Brand-aligned aesthetic presentation
Compliance with current commercial building standards.

