CASE STUDY
Golden Griffin
Elevating Everyday Spaces:
A Contemporary Washroom Upgrade.
Cr8tive Washrooms were appointed to deliver a full turnkey refurbishment of multi-floor commercial washroom facilities within a prestigious workplace environment in Warwickshire.
The client’s brief was clear — to transform outdated washrooms into modern, high-end spaces that reflect the quality of the wider office environment, while ensuring durability, hygiene, and ease of maintenance for high daily usage.
Our design focused on creating a refined, contemporary aesthetic that balances warmth with premium materials:
Rich wood-effect IPS (integrated panel system)to conceal services and introduce a natural, executive feel
Large-format grey porcelain wall tiling for a clean, seamless backdrop
Marble-effect solid surface vanity tops to elevate the overall finish
Countertop vessel basins paired with chrome fittings for a minimalist, high-end look
Feature mirrors with soft detailing to enhance light and spatial perception
The combination delivers a space that feels both luxurious and highly functional, suitable for a modern corporate setting.
This was a fully coordinated, multi-floor refurbishment, completed within a live commercial environment:
Full strip-out of existing washroom facilities
Installation of new IPS (Integrated Panel Systems) across all service walls
Bespoke vanity units with integrated storage
New sanitaryware including WCs, urinals, and vessel basins
Mechanical & electrical upgrades including:
IP-rated LED lighting
Updated power and containment
Ventilation improvements
Wall and floor finishes throughout
Decoration and final detailing
All works were carefully phased to minimise disruption to daily operations across multiple floors.
Live Environment Working
Operating across multiple floors within an occupied building required careful programming.
→ We implemented phased delivery and strict site management protocols to ensure minimal disruption.
Consistency Across Floors
Maintaining a consistent design language across all levels was essential.
→ Standardised specifications and coordinated drawings ensured a uniform, high-quality finish throughout.
Durability vs Aesthetics
The client required a premium look without compromising longevity.
→ We specified commercial-grade materials designed to withstand heavy use while retaining visual appeal.
Task: Design & Full Turnkey Installation
Client: Golden Graham
Location: Warwickshire
The Result
The completed washrooms deliver a significant uplift in both user experience and visual impact, transforming previously dated facilities into modern, executive-level environments.
Enhanced employee and visitor experience
Improved hygiene and maintenance efficiency
A finish aligned with the client’s corporate identity and standards
Why Choose Cr8tive Washrooms?
Full turnkey washroom refurbishment specialists
Expertise in multi-floor commercial projects
Design-led approach with practical, durable solutions
Proven delivery within live operational environments

